MaxIron Mobile
Technician work for IBM Maximo, on iOS and Android
Supervisors assign work in IBM Maximo. Technicians complete it on the phone: the job in front of them, labour time, materials, calibration and, where used, Nova capture. Records write to the same work orders. Screens are process-led, with one action presented at a time.
- Assigned work
- Offline queue
- Labour time
- Calibration
- Nova confirmation
9:41
OnlineHello, Alex Chen
My Schedule
Next up
Replace cooling water pump seal
WO-18421 · PUMP-1027
Due Today, 14:30
Inspect strainer basket
WO-18418 · STR-441
Today, 16:00
Product capabilities
The work Maximo already holds, completed in the field.
MaxIron Mobile is the technician client. Assignment, procedures and history stay in IBM Maximo. The screens below use work order WO-18421 as an example.
- Assigned work
- Technicians see the work orders a supervisor has assigned in IBM Maximo, with the next job and the site in view.
- Labour time
- Start, pause and stop the timer on the job. Time writes back to the same work order.
- Offline queue
- Work continues when the network drops. Queued changes and sync conflicts stay visible until the technician resolves them.
- Calibration
- Assigned datasheets load while the device is online. As-found and as-left points are recorded on the Maximo procedure.
- Materials and commands
- Issue materials, create follow-on work and run the commands the process allows, without leaving the work order.
- Nova capture
- Glasses can propose a meter reading. Confirm, Reject or Retake is required before Maximo is written.
Who uses it
- Field technicians
- Close assigned jobs on iOS or Android, including sites with poor signal.
- Maintenance supervisors
- Keep assignment in Maximo. The phone shows that same queue to the trade.
- Reliability and calibration
- Capture as-found and as-left points on the datasheet Maximo already holds.
- Programme owners
- Choose MaxIron Mobile as MaxIron-built software, or an IBM Maximo Mobile rollout, against the same estate.
Work order
The screen follows the job the technician is on.
WO-18421 is in progress on PUMP-1027 at BEDFORD. The timer is running, with Pause and Stop available. The technician can report work and record materials against the same job.
9:41
OnlineReplace cooling water pump seal
WO-18421 · PUMP-1027 · BEDFORD
Work timer is running
00:18:42
9:41
Offline · 2Sync status
3 changes saved on device
-
Q-14 · Worklog on WO-18421
Queued
-
Q-15 · Timer stop on WO-18421
Queued
-
Q-16 · Meter 26.8 CELCIUS
Conflict
Keep local Discard
Offline and conflict
Queued changes stay visible until they sync.
When the plant has no signal, the technician can still work. Queued writes remain listed. A meter conflict asks Keep local or discard. The disagreement is resolved on the device before Maximo is updated.
Calibration
Calibration uses the assigned Maximo datasheet.
The device loads the assigned Maximo calibration datasheet while online. The technician records as-found and as-left points against that procedure. Maximo's pluscwods work object holds the assigned datasheet.
9:41
OnlineCalibration
Assigned calibration work orders (pluscwods)
WO-18421
Datasheet DS-PUMP-1027-A
PUMP-1027 · BEDFORD
- As-found
- 4.02 bar
- As-left
- 4.00 bar
Calibration loads while the device is online. Offline calibration is not claimed.
Nova
Nova can propose a reading. The technician confirms it.
Speak from the phone, or review the glasses display in Wearer's View. OCR can propose a reading such as 26.8 degrees Celsius. The technician chooses Confirm, Reject or Retake before a reading reaches Maximo. MaxIron Nova provides this capture capability within Mobile.
9:41
OnlineVoice commands
Say Nova, then one of these commands. Pause ~2 seconds before Nova runs it.
Listening
Say Nova, then your command
Proposed meter reading
26.8 CELCIUS
WO-18421 · PUMP-1027
Start Nova from the phone. Writes wait for explicit confirmation.
9:41
OnlineMeter reading
26.8 CELCIUS
WO WO-18421
Accept · Reject · Retake
HUD mirrors the lens. Confirm on the glasses or from this phone view.
Related products and services
MaxIron Mobile, IBM Maximo Mobile and MaxIron Nova.
- MaxIron Mobile
- This product. Technician screens, queue, calibration and Nova on the phone.
- IBM Maximo Mobile
- The IBM application. We still deliver rollouts of that application as a service.
- MaxIron Nova
- The glasses and ring or band. Display-first capture that writes through the same work orders.
Defined scope
Product boundaries
Plan the rollout around connectivity, local data storage and the technician's responsibility for confirmed readings.
MaxIron-built technician software
MaxIron Mobile is MaxIron software with its own screens, queue and Nova capture. IBM Maximo Mobile rollouts remain a separate service for the IBM application.
Visible queue, stated cache limits
The device shows changes waiting to sync and any conflicts requiring a decision. An encrypted cache is not a shipped capability in MaxIron Mobile.
Calibration needs a live connection
Assigned calibration datasheets load while the device is online. Offline calibration is not offered.
Nova still waits for a person
Glasses OCR and voice can propose a reading. The write waits for Confirm, Reject or Retake.
Questions buyers ask
What is MaxIron Mobile?
A process-led technician app for assigned IBM Maximo work on iOS and Android. Screens follow one action at a time. Offline queue, labour time, calibration and optional Nova capture write back to the same work orders.
How does this sit beside IBM Maximo Mobile?
IBM Maximo Mobile is the IBM application. We still roll that application out as a service. MaxIron Mobile is MaxIron software. Both write to IBM Maximo. The choice is which field client the estate will run.
Where does MaxIron Nova sit?
Nova is the glasses and ring or band used with MaxIron Mobile. It can propose a reading. The technician confirms on the phone or the HUD before Maximo is written.
What happens when there is no signal?
The technician can keep working. Queued changes and conflicts stay on the device. When Maximo and the phone disagree, the technician chooses Keep local or discard.
Does calibration work offline?
No. Calibration datasheets load from pluscwods while the device is online. As-found and as-left points are captured after that load.
MaxIron products
MaxIron products that work alongside this
Walk through MaxIron Mobile against your Maximo
We will take assigned work through the schedule, the timer, an offline conflict and a confirmed Nova reading on your work orders.
Bring this to the first call
- One trade and the work those technicians actually close
- The sites where signal drops
- Whether IBM Maximo Mobile is already in the estate
- One meter face or datasheet that is awkward to capture