Technical drawings laid out flat on a sunlit workshop bench beside a scale model of an industrial plant, with a drafting rule and calipers resting on the paper

Product · Foundations

Three routes to a configured Maximo, and what each one costs to own.

MaxIron Blueprint is the third route: an IBM Maximo and MAS foundation add-on, installed and registered before the first workshop, carrying applications, workflows, statuses, domains, security groups, escalations, start centres and reports.

The choice

Every Maximo foundation arrives by one of three routes

They differ in who makes the standard decisions, when, and whether the reasons outlive the people who made them.

Configure from a blank sheet

You are on it if

A design phase is running with nothing installed, and hierarchies, statuses and failure codes are boxes on a wall.

The wrong move here

Senior specialist months on capability standard in every asset-intensive estate, then trimmed under the go-live date. The trims survive to year eight.

Inherit an estate nobody documented

Re-base during an upgrade →

You are on it if

Maximo has run for years, the configuration works, and whoever chose the domains has moved on.

The wrong move here

Leaving the reasons unwritten, so every upgrade opens with archaeology and ends in a description rather than a decision.

Start from a curated baseline

See implementation services →

You are on it if

A working environment sits in front of planners in week one, and design starts from the gap.

The wrong move here

Accepting it wholesale. A foundation nobody argues with is an operating model written for somebody else.

What is in the baseline

Configured and running when you log in on day one

One add-on registered against Maximo, with a version and a change record behind every item below.

Applications and screens
Set up for asset-intensive operations, so a week-one planner opens something recognisable.
Hierarchy, classification and domains
Hierarchy shapes, classification and the domains that hold values consistent once records arrive through MaxIron Data Loader.
Work types, statuses and lifecycle
Approval paths and status transitions as mature operators run them, with the failure code structure behind them.
Security groups and roles
Access split across planners, supervisors, technicians, contractors and auditors.
Escalations and automation scripts
Overdue work, missed approvals, unassigned jobs, expiring certification.
Start centres, reports and integration keys
Start centres and KPIs usable in week one, plus the keys your interfaces need.

What you change afterwards

Five steps from an installed baseline to your operating model

Every step happens on a running environment. The deltas the walkthrough produces are the point of the exercise.

  1. 01

    Install and register

    Installed on the Maximo or MAS environment and registered as a product, with a version and a change record.

    Owner MaxIron delivery lead Typically Day one

  2. 02

    Walk it with your people

    The first session raises, approves and closes a job with three supervisors, a planner and the stores lead.

    Owner Your process owners Typically Week one

  3. 03

    Name the deltas

    Design covers the gap between baseline and operation, written as specific changes.

    Owner Solution architect Typically Weeks two to three

  4. 04

    Configure on top

    Deltas released with author, sequence and date, through MaxIron Pipelines where the estate runs it.

    Owner MaxIron configuration team Typically Weeks three to six

  5. 05

    Carry it forward

    Baseline plus deltas moves through environments as one known shape and follows MAS releases.

    Owner You, with MaxIron support Typically Ongoing

One delta, all the way through

A shutdown status the baseline did not have

In the week-one walkthrough a maintenance supervisor says the baseline status path will not survive the annual shutdown: shutdown jobs sit in a personal spreadsheet, invisible to planning and reporting.

Deployed from the outset on every MaxIron-led Maximo and MAS implementation, and the standard foundation for estates we host and support across utilities, transport, manufacturing, oil and gas and public sector.

The maintenance manager asks for a held-for-shutdown status, visible in the planner view. It is released as a delta on the baseline, so seven months later a MAS release lands cleanly and the status still has a name against it.

Only the customer makes that call. MaxIron configures it, releases it, records who asked.

Scope and boundaries

Where a baseline stops being the answer

Commercial edges, before a scoping call.

It does not make your process decisions

How you approve work, who owns a shutdown and what the failure taxonomy means stay with your process owners.

Your data still has to be brought in

Cleansing and proving asset and location data is the larger half of most programmes, and MaxIron Data Loader is where it lands. Blueprint means it lands in agreed structures.

A baseline nobody adapts becomes debt

The week-one walkthrough is not optional. Accepted wholesale, the baseline belongs to another operator.

MaxIron Blueprint, frequently asked questions

What exactly is MaxIron Blueprint?
An IBM Maximo and MAS foundation add-on installed at engagement start: applications, workflows, security groups, domains, automation, start centres and reports as one version-controlled baseline.
How is this different from a starter pack or a template?
A template is a document. Blueprint is a registered Maximo product with a version, an upgrade path and a change history.
How much of the baseline survives contact with our operation?
Most of it. Hierarchy shapes, security patterns, domains and escalations tend to stay; approval thresholds, shutdown handling and status naming are where deltas sit.
Will Blueprint slow down our upgrades to MAS?
No. It is configuration and supported scripting delivered as a registered product, so it follows MAS releases.
Who owns the configuration we add on top?
You do. Deltas carry author, sequence and date, so the change record travels with the estate rather than a supplier relationship.

Bring the plan, and the date the foundation is currently due.

We install Blueprint in a clean MAS environment, walk what it ships with, then work through your list. You leave knowing which route you are on and which decisions stay yours.

Bring this to the walkthrough

  • The programme plan, with the date foundation design is due to finish
  • The work types and statuses your operation really uses
  • Asset and location hierarchy as it stands, spreadsheet included
  • The systems Maximo will exchange data with, awkward one included