Brand and press
MaxIron brand and press kit
The MaxIron logo, colour palette, typography and company information for partners, customers and journalists.
Logo
The MaxIron logo
Use the SVG for any production work and the PNG for slides, documents and email signatures. Use the variant that matches the surface.
Clear space
Always leave clear space around the logo equal to the height of the "M" mark on every side. Do not crowd the logo with other elements.
Do not
- Recolour the logo. Use only the supplied light and dark variants.
- Stretch, skew, rotate or otherwise distort the logo.
- Add drop shadows, glows, outlines or other visual effects.
- Place the logo on busy or low-contrast imagery. Use a solid panel if needed.
Colour
Palette
MaxIron purple is #8F00FF on dark backgrounds and #7C22D6 for text and links on light backgrounds. Navy is the canonical surface family.
MaxIron purple
Primary purple
#8F00FF
On dark
Primary purple, text on light
#7C22D6
On light
Purple tint
#A855F7
On dark
Purple tint, light
#C084FC
On dark
Navy
Primary dark surface
#020617
On dark
Secondary dark surface
#0F172A
On dark
Dark border
#1E293B
On dark
Muted ink
#475569
On light or dark
Muted light surface
#F8FAFC
On light
Light border
#E2E8F0
On light
Accents
Positive
#10B981
On light or dark
Attention
#F59E0B
On light or dark
Typography
Inter
MaxIron uses Inter throughout, regular for body, semibold for emphasis and bold for headings.
Heading 1
The right Maximo partner.
Heading 2
Built and run by MaxIron
Heading 3
Where it fits in your Maximo programme
Body
MaxIron delivers IBM Maximo and MAS programmes across utilities, transport, oil and gas and other regulated industries. We complement Maximo with our own delivery, operations and intelligence software, used on every programme we run.
For press
About MaxIron
Boilerplate
MaxIron is an IBM Gold Partner specialising in IBM Maximo and the Maximo Application Suite (MAS).
Headquartered in London, MaxIron delivers Maximo implementation, MAS upgrades, managed cloud hosting, application support and licensing to enterprises across the United Kingdom, Ireland, Europe and the United States. Sectors served include utilities, transport and airports, oil and gas, manufacturing, building materials, maritime and the public sector.
MaxIron also builds and runs its own software products that complement IBM Maximo and MAS in customer estates.
Quick facts
- Company
- Maxiron Ltd.
- Founded
- 2022
- Headquarters
- London, United Kingdom
- Focus
- IBM Maximo and Maximo Application Suite (MAS)
- IBM partnership
- IBM Gold Partner, IBM Partner Plus member
- Sectors
- Utilities, transport and airports, oil and gas, manufacturing, building materials, maritime, public sector
- Geographies
- United Kingdom, Ireland, Europe, United States
Trademark and usage
Using the MaxIron marks
Partners, customers and members of the press are welcome to use the MaxIron name and logo as supplied on this page, in unmodified form, for fair purposes such as press coverage, partner co-marketing, case studies and event materials. Always link to maxiron.com when used digitally.
Do not recolour, redraw or animate the marks. Do not add visual effects. Do not imply endorsement, partnership or certification that has not been agreed in writing. Do not use the MaxIron name or logo as part of your own product, service, company or domain name. Maxiron Ltd. retains all rights in the MaxIron name and marks.
Need a different format or have a partner question?
If you need an asset that isn't on this page (a specific resolution, a co-marketing template, leadership photography or a written quote) talk to us and we'll get it to you.
Talk to MaxIron